Complexity Classes

O(1)Constant
Independent of input size.

The operation takes the same time whether the input is 10 or 10 billion. Look for direct lookups: array index, hashmap get/put (average), stack push/pop.

Array access by indexHashmap insert / lookup (average)Stack push / pop, Queue enqueue / dequeueMath operations on primitives
O(log n)Logarithmic
Doubling n adds one step.

Each step halves the remaining work. Recognized in divide-and-conquer over a structure that supports cheap halving.

Binary search on a sorted arrayBalanced BST insert / search / deleteBinary heap insert / extract-minSkip list operations
O(n)Linear
Doubling n doubles the work.

Touch every element once. The standard cost of a single pass.

Iterating an array or listBFS / DFS counting steps in a treeTwo-pointer sweep on sorted dataSliding window total work (amortized)
O(n + m)Linear in two inputs
Linear in each input independently.

When the work scales with two separate inputs. Common in graph traversal (V + E) and merging two streams.

Graph BFS/DFS: O(V + E)Merging two sorted lists of length n and mKMP / Z-algorithm pattern matching: O(text + pattern)
O(n log n)Linearithmic
Sorting baseline.

The lower bound for comparison-based sorting. Appears whenever you sort, build a heap iteratively, or do log-n work n times.

Merge sort, quicksort (average), heapsort, TimsortBuilding a heap by repeated insertionSweeping intervals after sorting them
O(n * m)Product of two inputs
Multiplicative in the two dimensions.

Touching every cell of a 2D grid or doing m work per element in an n-length list. Distinct from O(n+m), this scales with the product.

Filling an n×m DP table (edit distance, LCS, unique paths)Matrix traversalPairwise comparison of two collections
O(n^2)Quadratic
Doubling n quadruples the work.

Nested loops over the same input. Acceptable for small n (n < ~10k), dangerous beyond that.

Bubble / insertion / selection sortNaïve pair comparisons (brute-force two-sum)Floyd-Warshall shortest paths
O(n^3)Cubic
Doubling n multiplies work by 8.

Three nested loops. Useful for graph algorithms over small vertex counts.

Floyd-Warshall (also fits here, depending on how you slice n)Naïve matrix multiplicationTriple-nested brute force searches
O(2^n)Exponential
Each extra input doubles the work.

Generating all subsets, or unmemoized branching recursion. Becomes infeasible past n ≈ 25-30.

Naïve Fibonacci (without memoization)Power set / subset enumerationBrute-force subset-sum / knapsack
O(n!)Factorial
Each extra input multiplies by another factor.

All permutations. Infeasible past n ≈ 10-12. Always look for a smarter approach.

Brute-force traveling salesmanGenerating all permutationsNaïve constraint satisfaction without pruning

Data Structure Operations

StructureAccessSearchInsertRemove
ArrayO(1)O(n)O(n)O(n)
Dynamic array
Push is O(1) amortized; arbitrary insert/remove shifts elements.
O(1)O(n)O(1) amortizedO(n)
Linked list (doubly)
* given a node reference; locating the node is O(n).
O(n)O(n)O(1)*O(1)*
Hash mapn/aO(1) avg / O(n) worstO(1) avgO(1) avg
Balanced BSTO(log n)O(log n)O(log n)O(log n)
Binary heapO(1) for min/maxO(n)O(log n)O(log n)
Trie
L = key length.
O(L)O(L)O(L)O(L)
Union-Find (DSU)
With path compression + union by rank. α is the inverse Ackermann.
n/aO(α(n)) ≈ O(1)O(α(n)) ≈ O(1)n/a

Canonical Algorithms

AlgorithmTimeSpace
Binary searchO(log n)O(1)
Merge sortO(n log n)O(n)
Quicksort (avg / worst)O(n log n) / O(n²)O(log n)
HeapsortO(n log n)O(1)
Counting sortO(n + k)O(k)
BFS / DFS on a graphO(V + E)O(V)
Dijkstra (binary heap)O((V + E) log V)O(V)
Bellman-FordO(V · E)O(V)
Topological sort (Kahn)O(V + E)O(V)
Kruskal's MSTO(E log E)O(V)
Floyd-WarshallO(V³)O(V²)
KMP / Z-algorithmO(n + m)O(n + m)

Common Pitfalls

Average vs Worst Case

Hashmap operations are O(1) average but O(n) worst case (collision chain). Quicksort is O(n log n) average, O(n²) worst. Default to the average case unless the interviewer probes pathological inputs.

Amortized Analysis

Dynamic-array push is O(1) amortized: most pushes are O(1), but an occasional resize is O(n). Averaged over many pushes the cost stays constant. Same idea applies to union-find's α(n) and to most sliding-window inner loops.

n vs k vs L

Use the right symbol for the right dimension. A heap of size k gives O(log k) ops, not O(log n). Trie ops are O(L) where L is the key length, not the alphabet or the trie size. Mixing them up is a common mistake in senior interviews.

Log Base Doesn't Matter

O(log₂ n) = O(log₁₀ n) = O(ln n). Constant factors fall out of Big O, so say “log n” and leave out the base.